COMPARISON : Flourescent /TL 42W Vs LED Tube 14W | |||||||||
Description | Unit | LED TUBE | KONVENSIONAL | ||||||
17W | 40W | ||||||||
DATA | |||||||||
A. | Lamp Figure | ||||||||
1 | Number of Luminaires | point | 1.00 | 1.00 | |||||
2 | Number of lamp per luminaire | pcs | 4.00 | 4.00 | |||||
3 | Actual Energy Consumption/lamp | watt | 17.00 | 45.00 | |||||
4 | Total Energy Consumption/Luminaire | watt | 68.00 | 180.00 | |||||
5 | Lamp life time (hours) | hrs | 50,000.00 | 8,000.00 | |||||
6 | Lamp life time (months) | month | 69.44 | 11.11 | |||||
7 | Lamp life time (year) | year | 5.79 | 0.93 | |||||
B. | Lamp Price | ||||||||
1 | Lamp price | Rp | 435,000.00 | 50,000.00 | |||||
2 | Ballast | Rp | 30,000.00 | ||||||
3 | Initial cost for lamp & gear/pc | Rp | 1,740,000.00 | 230,000.00 | |||||
C. | Installation Cost | ||||||||
1 | Installation cost per-luminaire (per point) | Rp | 100,000.00 | 100,000.00 | |||||
D | Manitenance Cost | ||||||||
1 | Lamp replacement cost | Rp | 20,000.00 | 20,000.00 | |||||
2 | Ballast & starter replacement cost | Rp | |||||||
E | Assumption | ||||||||
1 | Running hours/year | 24 | Hr/day | Hrs | 8,640.00 | 8,640.00 | |||
2 | Energy Cost Rp/kWhr-WBP | Rp | 1,200.00 | 1,200.00 | |||||
F | Initial Cost Analysis (per year) | ||||||||
1 | Total initial cost for lamp & gear/pc | Rp | 1,740,000.00 | 230,000.00 | |||||
2 | Total initial cost for installation | Rp | 100,000.00 | 100,000.00 | |||||
3 | Total initial cost | Rp | 1,840,000.00 | 330,000.00 | |||||
4 | Extra initial investment | Rp | 1,510,000.00 | ||||||
G | Running Cost Ananlysis (per year) | ||||||||
1 | Energy cost of all lamps/year | Rp | 705,024.00 | 1,866,240.00 | |||||
2 | Lamp cost all of lamps/year | Rp | 0.00 | 216,000.00 | |||||
3 | Lamp replacement cost all of lamps/year | Rp | 0.00 | 86,400.00 | |||||
4 | Total running cost of all lamps/year | Rp | 705,024.00 | 2,168,640.00 | |||||
5 | Saving in running cost/year | Rp | 1,463,616.00 | ||||||
H | Result | ||||||||
1 | Finance Indicator: | ||||||||
a. Extra initial investment | Rp | 1,510,000.00 | |||||||
b. BEP | Year | 1.03 | |||||||
c. BEP | Month | 12.38 | |||||||
2 | Environmental Indicator: | ||||||||
a. Power consumption/year | kWh | 587.52 | 1555.2 | ||||||
b. Reduced Power Consumption | % | 62.22% | |||||||
MULTI TEKNIK ENGINERING
Menrima jasa instalasi listrik,jaringan komputer,LCD projector, TV,Telephone CCTV ,AC & service HP,Komputer,Laptop,AC,Kulkas,Mesin Cuci segala merk hubungi kami HP 081904020156
Selasa, 06 November 2012
COMPARISON : Flourescent /TL 42W Vs LED Tube 14W
MENGHITUNG LISTRIK 3 PHASE
|
||||||||||||
P = V X I x 1,73 x cos Q | ||||||||||||
|
||||||||||||
VA Tersambung : | 33,000 | VA | 33.0 | kVA | ||||||||
Watt Tersambung : | 29,700 | Watt | 29.7 | kW | ||||||||
|
Tegangan : | 380 | Volt. | |||||||||
Cos j : | 0.90 |
|
||||||||||
|
Beban Terpakai : | 26400 | VA | 26.4 | kVA | |||||||
I Beban: | 40.11 | Amp | ||||||||||
Kapasitas MCB : | 50 | Amp | ||||||||||
Kapasitas Kabel : | 16.0 | mm² | ||||||||||
VA Terpakai: | 26,400 | VA | ||||||||||
Beban Terpakai: | 23,760 | Watt | ||||||||||
VAR Terpakai: | -11,507 | VAR | ||||||||||
Pemakaian kWh : | ||||||||||||
LWBP : | 213.8 | kWh / Hari | ||||||||||
WBP : | 71.3 | kWh / Hari | ||||||||||
TOTAL : | 285.1 | kWh / Hari | ||||||||||
TOTAL Pemakaian 1 Bulan : | 8,554 | kWh / Bulan | ||||||||||
Jam Operasional : | 12 | Jam | ||||||||||
LWBP : | 9.00 | Jam | ||||||||||
WBP : | 3.00 | Jam | ||||||||||
Hari dalam 1 Bulan : | 30 | Hari | ||||||||||
Note : VA ( Daya Semu ) | ||||||||||||
Watt ( Daya Nyata ) | ||||||||||||
VAR ( Daya Reaktif ) | ||||||||||||
enis Pengerjaan - Jangka Pendek | Biaya (Rp) | Keterangan |
# Pengerjaan Instalasi Client | ||
Instalasi Linux Client + Short Training | 100.000 | Exclude CD/DVD Linux |
Instalasi Windows | 50.000 | |
# Pengerjaan Jaringan Komputer | ||
Memasang kabel dari switch ke Komputer (Lokasi Datar) | 50.000 | Exclude Kabel UTP Rp. 1.5rb/feet |
Memasang kabel Backbone Switch-Switch (Lokasi Datar) | 60.000 | Exclude Kabel STP Rp. 2rb/feet |
Memasang Wifi per titik | 200.000 | Exclude Kabel UTP Rp. 1.5rb/feet |
# Pengerjaan Jaringan Telepon | ||
Memasang kabel dari telpon ke PABX (Lokasi Datar) | 30.000 | Exclude Kabel 2 wire Rp. 2,5rb/mtr |
Memasang kabel Backbone PABX-PABX (Lokasi Datar) | 60.000 | Exclude Kabel 4 wire Rp. 3,5rb/mtr |
Hanya Setting PABX | 30.000 | Setting per Line/Ext PABX |
# Pengerjaan Membangun Server | ||
Instalasi Windows untuk Server | 200.000 | |
Instalasi Linux untuk Server | 300.000 | |
Web Server Nginx+PHP-FPM+PostgreSQL | 800.000 | |
Server untuk Monitor Jaringan dan Server | 1.000.000 | |
File/Data Server | 1.000.000 | Harga utk maks 10 user |
Proxy/Internet Server+Autentikasi | 1.000.000 | Maks 100 user |
VoIP Server | 1.000.000 | |
Accurate Server Berbasis Linux | 300.000 | |
# Membuat Website | Negosiasi | |
# Transportasi (Darat) | ||
Depok, Citayam | 20.000 | per Kedatangan/Orang |
Kota Bogor, Jakarta Selatan | 30.000 | per Kedatangan/Orang |
Jak-Ut, Jak-Bar, Jak-Pus | 50.000 | per Kedatangan/Orang |
Tangerang, Bekasi | 80.000 | per Kedatangan/Orang |
Daerah Lain | Negosiasi | per Kedatangan/Orang |
# Biaya Garansi Pengerjaan (Maksimum 1 tahun) | ||
Untuk proyek Rp 0-30jt selama 2 bulan | Free | |
Harga Pengerjaan Rp 0-3jt selama 3 bulan | 100.000 | |
Harga Pengerjaan Rp 3-7jt selama 3 bulan | 200.000 | |
Harga Pengerjaan Rp 7-15jt selama 3 bulan | 300.000 | |
Jenis Pengerjaan - Jangka Panjang (Minimum 3 Bulan) | Biaya (Rp) | Keterangan |
Maintenance Komputer Klient Tiap 2 minggu | 20.000 | per Komputer, Minimal 15 User |
Maintenance Server | 500.000 | Maks File+Database 2 GB |
Maintenance Jaringan Komputer Tiap minggu | 150.000 | Maks 30 User |
Posting artikel + Spreading (sumber artikel dari pemilik) | 1.500.000 | Maks 300 artikel/bulan |
Monitoring Jaringan dan Server+ Pelaporan | 500.000 | Maks 10 Titik |
Training | Biaya (Rp) | Keterangan |
Training Linux Untuk Pemula | Info: www.cobalinux.co.cc |
- Pekerjaan yang tidak tertulis pada tabel di atas dapat dikonsultasikan via email: info[at]jaringankantor.com.
- Untuk pengadaan barang-barang dapat ditanyakan via email: info[at]jaringankantor.com
- Harga dapat berubah sewaktu-waktu tanpa pemberitahuan lebih lanjut.
Minggu, 21 Oktober 2012